12 Jan 2018

Multi-Million-Dollar AC Upgrade At Washington Mall

Work starts on multi-million-dollar AC upgrade at Washington Mall

Individual tenants will be able to control the temperature of their shops and offices once work on a multi-million-dollar replacement of an ageing air conditioning system at Washington Mall is complete.

Owners, Washington Properties (Bermuda) Ltd is investing $3.6 million in the upgrade, which is part of an $8 million revamp of the entire property.

Work will involve replacing the aging chiller plant and air handlers and installing a state of the art VRV system (Variable Refrigerant Volume) which will provide finer control of individual tenant spaces and increase efficiency.  

According to Paul Slaughter, Washington Properties’ Director and General Manager, the current A/C system is more than 20 years old.

 “At the moment there are several air handlers around the building and each does a group of tenants, so if a tenant works later it has to be on for the entire group, which is inefficient.

“It also means that one tenant has to have the same temperature as other tenants, which might not suit them,” said Mr Slaughter.

“The new system will mean that each tenant will have greater individual control over the operating hours of the air conditioning, with obvious implications for cost control.”

The upgrade is being managed by AIRCARE and is expected to last between 12 to 18 months. The work will be done in stages, said Mr. Slaughter, starting on the ground floor of the Reid Street entrance.

“There will be some disruption and we do apologise for that, but we believe the much improved, much more efficient end result will be very worthwhile, both for our retail and offices tenants as well as those who use the Mall for shopping,” added Mr. Slaughter.

Brendan Stones, AIRCARE’s General Manager said: “We are really pleased to be working with Washington Properties on this project.  Not only will the tenants have more autonomy on managing their environment, they should experience significant financial savings.

“Environmentally, this is a win-win scenario as well.   There will be significantly lower electricity consumption and the refrigerant used in Daikin VRV systems has Zero Ozone Depletion potential.”

As well as the new AC system, Washington Properties has also invested in a new solar electric system which is now up-and-running. 

It is also replacing shop fronts, coloured ceramic floor tiles, in the older sections of the Mall, will be replaced with Travertine tile to match the newer section of the Mall and some older elevators will be upgraded with new controls, machine rooms and other hardware.

The views and comments of TNN subscribers do not reflect TNN or anyone affiliated with TNN. TNN reserves the right to remove any illicit comments.


 
Read 303 times Last modified on Friday, 12 January 2018 22:15
(0 votes)

Leave a comment

Be sure to enter all of the required information below, indicated by an asterisk(*).

Weather Forecast

scattered clouds

73.4°F

Hamilton

Scattered Clouds

Humidity: 83%

Wind: 4.7 m/h

Sun

sky is clear

73/76°F

Mon

light rain

74/75°F

Tue

light rain

73/75°F

Wed

light rain

74/74°F

Poll



Breaking News Signup

Get breaking news and more!

  1. Popular
  2. Recent
  3. Comments
News Tip? Call or Text Us Now!

Get the latest breaking news instantly!


Enter your email address and you will receive the latest news as it happens!